A1M Jct 51 to Jct 50 Southbound Lane 3 & 2 Closure (3)
ClearedA1M Jct 51 to Jct 50 Southbound Lane 3 & 2 Closure (3)
- Start time
- Fri, Oct 9, 2026 7:00 PM
- Expected end
- Sat, Oct 10, 2026 5:00 AM
- Duration
- 3 hours 20 minutes 2 seconds
- Road
- A1(M) – A1(M) Southbound Between J51 And J50
- Category
- Construction Work
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Oct 9, 2026 7:25 PM
- Last updated
- Fri, Oct 9, 2026 9:44 PM
- Cleared
- Fri, Oct 9, 2026 10:20 PM
- Latest update: A1M Jct 51 to Jct 50 Southbound Lane 3 & 2 Closure (3)
- Coordinates
- 54.223296, -1.486633
- Latitude span
- 54.194881 – 54.245161
- Longitude span
- -1.502378 – -1.466403
- Bounding box centre
- 54.220021, -1.484391
- Location descriptions
-
- A1(M) southbound between J51 and J50
- Feed validity status
- Active
- Overall feed start
- Fri, Oct 9, 2026 7:00 PM
- Overall feed end
- Sat, Oct 10, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- A1(M) southbound between J51 and J50
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {B6411A68-E119-4772-B0AB-CA58BA342C94}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 431 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.223974 -1.487416 54.222672 -1.485998 54.221822 -1.485113 54.220926 -1.484233 54.220657 -1.483983
Segment 2
17 coordinate pairs- Description
- A1(M) southbound between J51 and J50
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {4CAB000E-4A25-447C-A58E-8813CF4F9856}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 3,090 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.220657 -1.483983 54.22019 -1.483549 54.219094 -1.482671 54.218311 -1.482084 54.217388 -1.481525 54.216119 -1.48079 54.215481 -1.480445 54.214863 -1.48007 54.214136 -1.479614 54.211628 -1.477957 54.209512 -1.476593 54.206678 -1.474629 54.2064 -1.474439 54.202537 -1.471792 54.199151 -1.46941 54.196922 -1.467792 54.194881 -1.466403
Segment 3
4 coordinate pairs- Description
- A1(M) southbound between J51 and J50
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {BF042E2E-D73B-49DA-BEAE-B348DF899340}
- Linear Element Type
- B Carriageway
- From Distance
- 1,574 m
- To Distance
- 2,301 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.245161 -1.502378 54.244592 -1.50195 54.243612 -1.501275 54.23907 -1.498384
Segment 4
19 coordinate pairs- Description
- A1(M) southbound between J51 and J50
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {652FC49A-5EE9-488D-8992-655BAC440FF3}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 1,828 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.23907 -1.498384 54.237961 -1.49766 54.236648 -1.496812 54.235617 -1.496127 54.234796 -1.495534 54.23394 -1.49487 54.232985 -1.494042 54.231902 -1.493053 54.230852 -1.49221 54.229916 -1.491518 54.229094 -1.490977 54.228317 -1.490499 54.227685 -1.490146 54.226935 -1.489734 54.226423 -1.489395 54.225851 -1.489012 54.225245 -1.488557 54.224662 -1.488045 54.223974 -1.487416
- Geometry type
- MultiLineString
- Geometry points
- 45
- First coordinate pair
- -1.487416, 54.223974
- Road section segments
- 1
- Road section points
- 45
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.487416,
54.223974
],
[
-1.485998,
54.222672
],
[
-1.485113,
54.221822
],
[
-1.484233,
54.220926
],
[
-1.483983,
54.220657
],
[
-1.483983,
54.220657
],
[
-1.483549,
54.22019
],
[
-1.482671,
54.219094
],
[
-1.482084,
54.218311
],
[
-1.481525,
54.217388
],
[
-1.48079,
54.216119
],
[
-1.480445,
54.215481
],
[
-1.48007,
54.214863
],
[
-1.479614,
54.214136
],
[
-1.477957,
54.211628
],
[
-1.476593,
54.209512
],
[
-1.474629,
54.206678
],
[
-1.474439,
54.2064
],
[
-1.471792,
54.202537
],
[
-1.46941,
54.199151
],
[
-1.467792,
54.196922
],
[
-1.466403,
54.194881
],
[
-1.502378,
54.245161
],
[
-1.50195,
54.244592
],
[
-1.501275,
54.243612
],
[
-1.498384,
54.23907
],
[
-1.498384,
54.23907
],
[
-1.49766,
54.237961
],
[
-1.496812,
54.236648
],
[
-1.496127,
54.235617
],
[
-1.495534,
54.234796
],
[
-1.49487,
54.23394
],
[
-1.494042,
54.232985
],
[
-1.493053,
54.231902
],
[
-1.49221,
54.230852
],
[
-1.491518,
54.229916
],
[
-1.490977,
54.229094
],
[
-1.490499,
54.228317
],
[
-1.490146,
54.227685
],
[
-1.489734,
54.226935
],
[
-1.489395,
54.226423
],
[
-1.489012,
54.225851
],
[
-1.488557,
54.225245
],
[
-1.488045,
54.224662
],
[
-1.487416,
54.223974
]
]
]
}
View road section coordinates
[
[
[
-1.487416,
54.223974
],
[
-1.485998,
54.222672
],
[
-1.485113,
54.221822
],
[
-1.484233,
54.220926
],
[
-1.483983,
54.220657
],
[
-1.483983,
54.220657
],
[
-1.483549,
54.22019
],
[
-1.482671,
54.219094
],
[
-1.482084,
54.218311
],
[
-1.481525,
54.217388
],
[
-1.48079,
54.216119
],
[
-1.480445,
54.215481
],
[
-1.48007,
54.214863
],
[
-1.479614,
54.214136
],
[
-1.477957,
54.211628
],
[
-1.476593,
54.209512
],
[
-1.474629,
54.206678
],
[
-1.474439,
54.2064
],
[
-1.471792,
54.202537
],
[
-1.46941,
54.199151
],
[
-1.467792,
54.196922
],
[
-1.466403,
54.194881
],
[
-1.502378,
54.245161
],
[
-1.50195,
54.244592
],
[
-1.501275,
54.243612
],
[
-1.498384,
54.23907
],
[
-1.498384,
54.23907
],
[
-1.49766,
54.237961
],
[
-1.496812,
54.236648
],
[
-1.496127,
54.235617
],
[
-1.495534,
54.234796
],
[
-1.49487,
54.23394
],
[
-1.494042,
54.232985
],
[
-1.493053,
54.231902
],
[
-1.49221,
54.230852
],
[
-1.491518,
54.229916
],
[
-1.490977,
54.229094
],
[
-1.490499,
54.228317
],
[
-1.490146,
54.227685
],
[
-1.489734,
54.226935
],
[
-1.489395,
54.226423
],
[
-1.489012,
54.225851
],
[
-1.488557,
54.225245
],
[
-1.488045,
54.224662
],
[
-1.487416,
54.223974
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Fri, Oct 9, 2026 7:25 PM
- Record versioned
- Fri, Oct 9, 2026 9:44 PM
- Coordinate source
- Geometry
Driving on the A1(M)? See every live closure, roadwork and planned restriction on this road.
A1(M) live closuresRelated incidents
A1(M) both directions Jct 14 to 17 mobile lane 3 closure
Cleared Roadworks National HighwaysExpected to clear in 11 hours 24 minutes
A1(M) both directions Jct 14 to 17 mobile lane 3 closure
A1(M) northbound Jct 7 to Jct 10 IPV works
Planned Roadworks National HighwaysStarts in 3 hours 24 minutes
A1(M) northbound Jct 7 to Jct 10 IPV works
A1M southbound Jct 10 to Jct 7 mobile lane closures
Planned Roadworks National HighwaysStarts in 3 hours 24 minutes
A1M southbound Jct 10 to Jct 7 mobile lane closures
A1M Jct 56 to Jct 57 Northbound Lane 2 Closure
Planned Roadworks National HighwaysStarts in 2 hours 24 minutes
A1M Jct 56 to Jct 57 Northbound Lane 2 Closure
A1M Jct 59 to Jct 60 Northbound Lane 1 and HS Closure
Planned Roadworks National HighwaysStarts in 2 hours 24 minutes
A1M Jct 59 to Jct 60 Northbound Lane 1 and HS Closure
A1M northbound Jct 35 to Jct 36 lane 1 closure (13/0 to 13/9)
Planned Roadworks National HighwaysStarts in 2 hours 24 minutes
A1M northbound Jct 35 to Jct 36 lane 1 closure (13/0 to 13/9)