A19 southbound A181 Wellfield to A179 Sheraton Interchange lane 2 closure

Cleared

A19 southbound A181 Wellfield to A179 Sheraton Interchange lane 2 closure

Start time
Sun, Sep 27, 2026 7:00 PM
Expected end
Mon, Sep 28, 2026 4:00 AM
Duration
4 hours 50 minutes 1 second
Road
A19 – A19 Southbound Between A181 And A179
Category
Road Maintenance
Direction
Southbound
Carriageway
Dual Carriageway
Lanes affected
Lane 2 closed, 1 of 1 lanes affected
Reason
Maintenance Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Sun, Sep 27, 2026 6:46 PM
Last updated
Sun, Sep 27, 2026 11:18 PM
Cleared
Sun, Sep 27, 2026 11:50 PM
  • Latest update: A19 southbound A181 Wellfield to A179 Sheraton Interchange lane 2 closure
Coordinates
54.707321, -1.318030
Latitude span
54.706462 – 54.707905
Longitude span
-1.318178 – -1.317827
Bounding box centre
54.707184, -1.318003
Location descriptions
  • A19 southbound between A181 and A179
Feed validity status
Active
Overall feed start
Sun, Sep 27, 2026 7:00 PM
Overall feed end
Mon, Sep 28, 2026 4:00 AM
Feed window length
9 hours
Probability code (raw)
certain
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

4 coordinate pairs
Description
A19 southbound between A181 and A179
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A19
Linear Element Model
The Network Model
Linear Element Id
{34FEF2DB-393A-4912-98BC-8CEADABBEBCE}
Linear Element Type
B Carriageway
From Distance
0 m
To Distance
152 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
54.70782 -1.318152
54.707433 -1.318035
54.706488 -1.317833
54.706462 -1.317827

Segment 2

2 coordinate pairs
Description
A19 southbound between A181 and A179
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A19
Linear Element Model
The Network Model
Linear Element Id
{CA115006-8B57-4A7F-973B-4449C37AB53A}
Linear Element Type
B Carriageway
From Distance
59 m
To Distance
69 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
54.707905 -1.318178
54.70782 -1.318152
Geometry type
MultiLineString
Geometry points
6
First coordinate pair
-1.318152, 54.707820
Road section segments
1
Road section points
6
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -1.318152,
                54.70782
            ],
            [
                -1.318035,
                54.707433
            ],
            [
                -1.317833,
                54.706488
            ],
            [
                -1.317827,
                54.706462
            ],
            [
                -1.318178,
                54.707905
            ],
            [
                -1.318152,
                54.70782
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -1.318152,
            54.70782
        ],
        [
            -1.318035,
            54.707433
        ],
        [
            -1.317833,
            54.706488
        ],
        [
            -1.317827,
            54.706462
        ],
        [
            -1.318178,
            54.707905
        ],
        [
            -1.318152,
            54.70782
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Maintenance Work
Compliance
Mandatory
Probability
Certain
Validity status
Active
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Sun, Sep 27, 2026 6:46 PM
Record versioned
Sun, Sep 27, 2026 11:18 PM
Coordinate source
Geometry

Driving on the A19? See every live closure, roadwork and planned restriction on this road.

A19 live closures

Related incidents

A19 Southbound Entry Slip Road from A139 Norton. Lane 1 Closure.

Planned Roadworks National Highways
Stockton-On-Tees A19 · A19 Southbound Access From A139

Expected to clear in 9 hours 46 minutes

Started 12 Oct 2026, 19:00 Expected clear 13 Oct 2026, 05:00

A19 Southbound Entry Slip Road from A139 Norton. Lane 1 Closure.

Category: Road Maintenance
View update

A19 Redhill Overbridge northbound lane 2 closure

Planned Roadworks National Highways
Stockton-On-Tees A19 · A19 Northbound Between A67 And A174

Expected to clear in 8 hours 46 minutes

Started 12 Oct 2026, 19:00 Expected clear 13 Oct 2026, 04:00

A19 Redhill Overbridge northbound lane 2 closure

Category: Road Maintenance
View update

A19 southbound Dalton Piercy to A689 Wolviston Interchange lane 2 closure

Cleared Roadworks National Highways
Hartlepool A19 · A19 Southbound Between A179 And A689

Cleared 3 minutes 35 seconds ago

Started 12 Oct 2026, 19:00 Ended 12 Oct 2026, 19:10

A19 southbound Dalton Piercy to A689 Wolviston Interchange lane 2 closure

Category: Construction Work
View update

A19 Moorfarm Approach Southbound Lane 1 Closure

Cleared Roadworks National Highways
North Tyneside A19 · A19 Southbound Between A1171 And A189

Cleared 13 minutes 35 seconds ago

Started 12 Oct 2026, 19:00 Ended 12 Oct 2026, 19:00

A19 Moorfarm Approach Southbound Lane 1 Closure

Category: Authority Operation
View update

A19 northbound Easington to A182 Cold Hesledon Interchange carriageway closure including slip roads

Cleared Roadworks National Highways
Sunderland A19 · A19 Northbound Within The A182 Near Murton Junction

Cleared 3 minutes 35 seconds ago

Started 12 Oct 2026, 19:00 Ended 12 Oct 2026, 19:10

A19 northbound Easington to A182 Cold Hesledon Interchange carriageway closure including slip roads

Category: Construction Work
View update

A19 Moorfarm Roundabout Lane 1 Closure with Switching

Cleared Roadworks National Highways
North Tyneside A19 · Roundabout At A19/A189

Cleared 13 minutes 35 seconds ago

Started 12 Oct 2026, 19:00 Ended 12 Oct 2026, 19:00

A19 Moorfarm Roundabout Lane 1 Closure with Switching

Category: Authority Operation
View update