A14 westbound lay-by closure
ClearedA14 westbound lay-by closure
- Start time
- Fri, Jul 3, 2026 12:00 PM
- Expected end
- Sat, Jul 4, 2026 5:00 AM
- Duration
- 16 hours 50 minutes 2 seconds
- Road
- A14 – A14 Westbound Between J6 And J4
- Category
- Road Maintenance
- Direction
- Westbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jun 1, 2026 1:58 PM
- Last updated
- Sat, Jul 4, 2026 4:24 AM
- Cleared
- Sat, Jul 4, 2026 4:50 AM
- Latest update: A14 westbound lay-by closure
- Coordinates
- 52.412805, -0.782566
- Latitude span
- 52.412761 – 52.412915
- Longitude span
- -0.784304 – -0.780317
- Bounding box centre
- 52.412838, -0.782311
- Location descriptions
-
- A14 westbound between J6 and J4
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 3, 2026 12:00 PM
- Overall feed end
- Sat, Jul 4, 2026 5:00 AM
- Feed window length
- 17 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A14 westbound between J6 and J4
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {7A67DB1C-FB86-442E-B0B4-515AC8C28A05}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 11 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.412812 -0.784131 52.412828 -0.784304
Segment 2
8 coordinate pairs- Description
- A14 westbound between J6 and J4
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {601C050C-6221-48F3-BFF2-72D8DA1BFAFA}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 184 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.412811 -0.781426 52.412796 -0.781662 52.412781 -0.781986 52.412761 -0.782677 52.412766 -0.783133 52.412768 -0.783324 52.41278 -0.783691 52.412812 -0.784131
Segment 3
3 coordinate pairs- Description
- A14 westbound between J6 and J4
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {186A8258-979A-4F05-B2EC-52FA5E162911}
- Linear Element Type
- B Carriageway
- From Distance
- 1,000 m
- To Distance
- 1,076 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.412915 -0.780317 52.412826 -0.781146 52.412811 -0.781426
- Geometry type
- MultiLineString
- Geometry points
- 13
- First coordinate pair
- -0.784131, 52.412812
- Road section segments
- 1
- Road section points
- 13
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.784131,
52.412812
],
[
-0.784304,
52.412828
],
[
-0.781426,
52.412811
],
[
-0.781662,
52.412796
],
[
-0.781986,
52.412781
],
[
-0.782677,
52.412761
],
[
-0.783133,
52.412766
],
[
-0.783324,
52.412768
],
[
-0.783691,
52.41278
],
[
-0.784131,
52.412812
],
[
-0.780317,
52.412915
],
[
-0.781146,
52.412826
],
[
-0.781426,
52.412811
]
]
]
}
View road section coordinates
[
[
[
-0.784131,
52.412812
],
[
-0.784304,
52.412828
],
[
-0.781426,
52.412811
],
[
-0.781662,
52.412796
],
[
-0.781986,
52.412781
],
[
-0.782677,
52.412761
],
[
-0.783133,
52.412766
],
[
-0.783324,
52.412768
],
[
-0.783691,
52.41278
],
[
-0.784131,
52.412812
],
[
-0.780317,
52.412915
],
[
-0.781146,
52.412826
],
[
-0.781426,
52.412811
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jun 1, 2026 1:58 PM
- Record versioned
- Sat, Jul 4, 2026 4:24 AM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
A14 eastbound Jct 57 to Jct 58 carriageway closure
Cleared Roadworks National HighwaysExpected to clear in 20 hours 23 minutes
A14 eastbound Jct 57 to Jct 58 carriageway closure
A14 both directions Jct 43 to Jct 49 mobile lane closures (MP 144/3 to 166/5)
Planned Roadworks National HighwaysStarts in 11 hours 23 minutes
A14 both directions Jct 43 to Jct 49 mobile lane closures (MP 144/3 to 166/5)
A14 westbound Jct 55 to Jct 53 lane 1 closure (MP 186/6 to 183/8)
Planned Roadworks National HighwaysStarts in 11 hours 23 minutes
A14 westbound Jct 55 to Jct 53 lane 1 closure (MP 186/6 to 183/8)
A14 eastbound Jct 54 to Jct 56 lane closure (MP 187/0 to 193/0)
Planned Roadworks National HighwaysStarts in 11 hours 23 minutes
A14 eastbound Jct 54 to Jct 56 lane closure (MP 187/0 to 193/0)
A14 both directions Jct 55 to Jct 62 mobile lane closures (MP 188/5 to 210/6)
Planned Roadworks National HighwaysStarts in 11 hours 23 minutes
A14 both directions Jct 55 to Jct 62 mobile lane closures (MP 188/5 to 210/6)
A14 both directions Jct 42 to Jct 44 lane 2 closures
Planned Roadworks National HighwaysStarts in 10 hours 23 minutes
A14 both directions Jct 42 to Jct 44 lane 2 closures