A14 eastbound layby closure
ClearedA14 eastbound layby closure
- Start time
- Mon, Jul 27, 2026 12:28 PM
- Expected end
- Sat, Aug 1, 2026 5:00 AM
- Duration
- 2 days 11 hours 32 minutes
- Road
- A14 – A14 Eastbound Between J2 And J3
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 29, 2026 9:22 PM
- Last updated
- Wed, Jul 29, 2026 11:29 PM
- Cleared
- Thu, Jul 30, 2026 12:00 AM
- Latest update: A14 eastbound layby closure
- Coordinates
- 52.405438, -0.885579
- Latitude span
- 52.405340 – 52.405485
- Longitude span
- -0.887726 – -0.883813
- Bounding box centre
- 52.405413, -0.885770
- Location descriptions
-
- A14 eastbound between J2 and J3
- Feed validity status
- Active
- Overall feed start
- Mon, Jul 27, 2026 12:28 PM
- Overall feed end
- Sat, Aug 1, 2026 5:00 AM
- Feed window length
- 4 days 16 hours 32 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- A14 eastbound between J2 and J3
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {B75AFE52-149F-451B-BEA1-8B771F0438E0}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 182 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.405403 -0.886745 52.405454 -0.885926 52.40546 -0.885573 52.405479 -0.884793 52.405483 -0.884249 52.405485 -0.88406
Segment 2
2 coordinate pairs- Description
- A14 eastbound between J2 and J3
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {CEF3EF60-DC93-4680-A8F6-0CE457311EF1}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 16 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.405485 -0.88406 52.40548 -0.883813
Segment 3
3 coordinate pairs- Description
- A14 eastbound between J2 and J3
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {3753114B-5AFF-4425-8F39-28106646E9E5}
- Linear Element Type
- A Carriageway
- From Distance
- 527 m
- To Distance
- 594 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.40534 -0.887726 52.405345 -0.887678 52.405403 -0.886745
- Geometry type
- MultiLineString
- Geometry points
- 11
- First coordinate pair
- -0.886745, 52.405403
- Road section segments
- 1
- Road section points
- 11
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.886745,
52.405403
],
[
-0.885926,
52.405454
],
[
-0.885573,
52.40546
],
[
-0.884793,
52.405479
],
[
-0.884249,
52.405483
],
[
-0.88406,
52.405485
],
[
-0.88406,
52.405485
],
[
-0.883813,
52.40548
],
[
-0.887726,
52.40534
],
[
-0.887678,
52.405345
],
[
-0.886745,
52.405403
]
]
]
}
View road section coordinates
[
[
[
-0.886745,
52.405403
],
[
-0.885926,
52.405454
],
[
-0.885573,
52.40546
],
[
-0.884793,
52.405479
],
[
-0.884249,
52.405483
],
[
-0.88406,
52.405485
],
[
-0.88406,
52.405485
],
[
-0.883813,
52.40548
],
[
-0.887726,
52.40534
],
[
-0.887678,
52.405345
],
[
-0.886745,
52.405403
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 6
- Record created
- Wed, Jul 29, 2026 9:22 PM
- Record versioned
- Wed, Jul 29, 2026 11:29 PM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
A14 both directions Jct 55 to Jct 62 mobile lane closures (MP 188/5 to 210/6)
Planned Roadworks National HighwaysStarts in 7 hours 30 minutes
A14 both directions Jct 55 to Jct 62 mobile lane closures (MP 188/5 to 210/6)
A14 eastbound Jct 38 to Jct 41 carriageway closure
Cleared Roadworks National HighwaysExpected to clear in 15 hours 30 minutes
A14 eastbound Jct 38 to Jct 41 carriageway closure
A14 both directions Jct 43 to Jct 49 mobile lane closures (MP 144/3 to 166/5)
Planned Roadworks National HighwaysStarts in 7 hours 30 minutes
A14 both directions Jct 43 to Jct 49 mobile lane closures (MP 144/3 to 166/5)
A14 eastbound Jct 2 entry slip road closure
Planned Roadworks National HighwaysStarts in 6 hours 30 minutes
A14 eastbound Jct 2 entry slip road closure
A14 both directions Bythorn to Little Catworth lane 2 closures (MP 54/6 to 60/8)
Planned Roadworks National HighwaysStarts in 6 hours 30 minutes
A14 both directions Bythorn to Little Catworth lane 2 closures (MP 54/6 to 60/8)
A14 eastbound Jct 57 to Jct 58 carriageway closure
Planned Roadworks National HighwaysStarts in 6 hours 30 minutes
A14 eastbound Jct 57 to Jct 58 carriageway closure