A14 both directions Jct 55 to Jct 62 mobile lane closures (MP 188/5 to 210/6)
ClearedA14 both directions Jct 55 to Jct 62 mobile lane closures (MP 188/5 to 210/6)
- Start time
- Tue, Jul 21, 2026 8:00 PM
- Expected end
- Wed, Jul 22, 2026 4:00 AM
- Duration
- 7 hours 25 minutes 2 seconds
- Road
- A14 – A14 Eastbound Between J58 And J59
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 16, 2026 12:03 PM
- Last updated
- Wed, Jul 22, 2026 3:08 AM
- Cleared
- Wed, Jul 22, 2026 3:25 AM
- Latest update: A14 both directions Jct 55 to Jct 62 mobile lane closures (MP 188/5 to 210/6)
- Coordinates
- 51.996179, 1.307158
- Latitude span
- 51.994548 – 51.997552
- Longitude span
- 1.300222 – 1.313690
- Bounding box centre
- 51.996050, 1.306956
- Location descriptions
-
- A14 eastbound between J58 and J59
- Feed validity status
- Planned
- Overall feed start
- Tue, Jul 21, 2026 8:00 PM
- Overall feed end
- Wed, Jul 22, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- A14 eastbound between J58 and J59
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {0AE0A127-F75F-4679-99BD-059B11715031}
- Linear Element Type
- A Carriageway
- From Distance
- 567 m
- To Distance
- 666 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.997552 1.300222 51.997346 1.300884 51.997177 1.301511 51.997174 1.301524
Segment 2
22 coordinate pairs- Description
- A14 eastbound between J58 and J59
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {63A638FF-EF02-46FB-8D19-789886934A1F}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 895 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.997174 1.301524 51.997118 1.301731 51.996916 1.302616 51.996774 1.303348 51.996665 1.304025 51.996562 1.30479 51.996455 1.305729 51.996337 1.306897 51.996261 1.307583 51.996193 1.308154 51.996126 1.30863 51.99604 1.30913 51.995956 1.309564 51.995871 1.309955 51.995714 1.310581 51.995552 1.311141 51.995408 1.311607 51.995235 1.312097 51.995051 1.312565 51.994842 1.313044 51.994618 1.313552 51.994548 1.31369
- Geometry type
- MultiLineString
- Geometry points
- 26
- First coordinate pair
- 1.300222, 51.997552
- Road section segments
- 1
- Road section points
- 26
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
1.300222,
51.997552
],
[
1.300884,
51.997346
],
[
1.301511,
51.997177
],
[
1.301524,
51.997174
],
[
1.301524,
51.997174
],
[
1.301731,
51.997118
],
[
1.302616,
51.996916
],
[
1.303348,
51.996774
],
[
1.304025,
51.996665
],
[
1.30479,
51.996562
],
[
1.305729,
51.996455
],
[
1.306897,
51.996337
],
[
1.307583,
51.996261
],
[
1.308154,
51.996193
],
[
1.30863,
51.996126
],
[
1.30913,
51.99604
],
[
1.309564,
51.995956
],
[
1.309955,
51.995871
],
[
1.310581,
51.995714
],
[
1.311141,
51.995552
],
[
1.311607,
51.995408
],
[
1.312097,
51.995235
],
[
1.312565,
51.995051
],
[
1.313044,
51.994842
],
[
1.313552,
51.994618
],
[
1.31369,
51.994548
]
]
]
}
View road section coordinates
[
[
[
1.300222,
51.997552
],
[
1.300884,
51.997346
],
[
1.301511,
51.997177
],
[
1.301524,
51.997174
],
[
1.301524,
51.997174
],
[
1.301731,
51.997118
],
[
1.302616,
51.996916
],
[
1.303348,
51.996774
],
[
1.304025,
51.996665
],
[
1.30479,
51.996562
],
[
1.305729,
51.996455
],
[
1.306897,
51.996337
],
[
1.307583,
51.996261
],
[
1.308154,
51.996193
],
[
1.30863,
51.996126
],
[
1.30913,
51.99604
],
[
1.309564,
51.995956
],
[
1.309955,
51.995871
],
[
1.310581,
51.995714
],
[
1.311141,
51.995552
],
[
1.311607,
51.995408
],
[
1.312097,
51.995235
],
[
1.312565,
51.995051
],
[
1.313044,
51.994842
],
[
1.313552,
51.994618
],
[
1.31369,
51.994548
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Jul 16, 2026 12:03 PM
- Record versioned
- Wed, Jul 22, 2026 3:08 AM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
A14 eastbound Jct 23 to Jct 24 lane 1 and 2 closure (MP 81/1 to 82/0)
Active Roadworks National HighwaysExpected to clear in 9 hours 20 minutes
A14 eastbound Jct 23 to Jct 24 lane 1 and 2 closure (MP 81/1 to 82/0)
A14 eastbound Jct 37 to Jct 38 lane 1 closure (MP 122/4 to 124/9)
Planned Roadworks National HighwaysExpected to clear in 9 hours 20 minutes
A14 eastbound Jct 37 to Jct 38 lane 1 closure (MP 122/4 to 124/9)
A14 eastbound Jct 32 to Jct 33 lane 1 closure (MP 99/4 to 100/7)
Planned Roadworks National HighwaysExpected to clear in 8 hours 20 minutes
A14 eastbound Jct 32 to Jct 33 lane 1 closure (MP 99/4 to 100/7)
A14 eastbound Jct 51 to Jct 52 lane 2 closure (MP 174/5 to 178/1)
Planned Roadworks National HighwaysStarts in 1 hour 20 minutes
A14 eastbound Jct 51 to Jct 52 lane 2 closure (MP 174/5 to 178/1)
A14 westbound Jct 59 entry slip road closure
Planned Roadworks National HighwaysStarts in 50 minutes 26 seconds
A14 westbound Jct 59 entry slip road closure
A14 eastbound Jct 52 lane 1 closure (MP 180/2 to 182/0)
Cleared Roadworks National HighwaysCleared 22 hours 29 minutes ago
A14 eastbound Jct 52 lane 1 closure (MP 180/2 to 182/0)