A1 northbound Brampton Hut exit slip road closure
ClearedA1 northbound Brampton Hut exit slip road closure
- Start time
- Fri, Oct 2, 2026 8:00 PM
- Expected end
- Sat, Oct 3, 2026 4:00 AM
- Duration
- 2 seconds
- Category
- Road Maintenance
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Oct 2, 2026 10:28 AM
- Last updated
- Fri, Oct 2, 2026 2:23 PM
- Cleared
- Fri, Oct 2, 2026 8:00 PM
- Latest update: A1 northbound Brampton Hut exit slip road closure
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 2, 2026 8:00 PM
- Overall feed end
- Sat, Oct 3, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Oct 2, 2026 10:28 AM
- Record versioned
- Fri, Oct 2, 2026 2:23 PM
Related incidents
A666 Southbound Jct 3 entry slip road hardshoulder closure to MP 3/4
Active Roadworks National HighwaysExpected to clear in 3 days 14 hours
A666 Southbound Jct 3 entry slip road hardshoulder closure to MP 3/4
A1M Jct 52 to Jct 51 Southbound Hard Shoulder Closure
Planned Roadworks National HighwaysExpected to clear in 10 minutes 42 seconds
A1M Jct 52 to Jct 51 Southbound Hard Shoulder Closure
M1 both directions Jct 10 to Jct 6A mobile lane closures (MP 49/4 to 33/8)
Planned Roadworks National HighwaysExpected to clear in 10 minutes 42 seconds
M1 both directions Jct 10 to Jct 6A mobile lane closures (MP 49/4 to 33/8)
M11 northbound Jct 7A to Jct 8 hard shoulder lane closure (MP 36/7A to 38/0A)
Planned Roadworks National HighwaysExpected to clear in 10 minutes 42 seconds
M11 northbound Jct 7A to Jct 8 hard shoulder lane closure (MP 36/7A to 38/0A)
Hard shoulder closure northbound
Planned Roadworks National HighwaysExpected to clear in 1 hour 40 minutes
Hard shoulder closure northbound
Hard shoulder mobile lane closure northbound
Planned Roadworks National HighwaysExpected to clear in 2 hours 40 minutes
Hard shoulder mobile lane closure northbound